A tired three-bed terrace off Keighley Road, rewired, replumbed and rebuilt room by room while the owners lived with family for eleven weeks.

Where
Skipton, North Yorkshire
How long
11 weeks
Finished
March 2025
Trades on site
9 coordinated

Before & after

Drag it across.

Same room, same angle. The handle moves with your finger, or with the arrow keys.

Victorian terrace, taken back to brick once finished
Victorian terrace, taken back to brick before work started
BeforeAfter

The job

What actually happened

The Hardcastles bought this house knowing it needed everything. What they did not want was to spend a year of evenings ringing round trades and standing in for deliveries, which is roughly what had happened to them on their last house.

We surveyed it over two visits, priced the whole job as one number, and gave them a week-by-week programme before they committed. That programme is what they planned their eleven weeks away around.

The house had the usual surprises. A chimney breast on the first floor had been removed at some point without support, and there was rot under the bay window that only showed once the flooring came up. Both were found in week one, both were priced and agreed within two days, and neither moved the completion date because the plastering had not started yet.

Every room was replastered, the house was fully rewired, the heating system was replaced and the bathroom moved from the ground floor extension up to the box room where it always should have been. The kitchen came from DIY Kitchens and we fitted it.

Photos

Tap any photo to see it full size.

Thinking about something similar?

Tell us what you've got in mind.

Free survey, fixed written price, and a schedule you can plan around. Nothing about it commits you to anything.

Mon–Fri 7.30am–6pm · Sat 8am–1pm · Covering Skipton & the Yorkshire Dales